South of France - Vessel Route Restrictions
3 February 2019
Regulations 3.9a
All vessels of 300 gt and above must use a route that passes 2 miles S of Île du Porquerolles (43 degrees 00.01N 6 degrees13.63E), Île de Port-Cros (43 degrees 00.31N 6 degrees 23.67E) and Ile du Levant (43 degrees 01.90N 6 degrees 28.20E). If the wind exceeds 20 kn and the swell exceeds 2 m; or if the firing practice areas S of the islands are active, vessels may use Petite Passe, after reporting to the signal station located on Île du Porquerolles.
Speed through Petite Passe is limited to 12 kn.Vessels may also use Grande Passe provided they maintain a distance of at least 2 miles from the coast. The speed limit within Grande Passe is 16kn. Between the mainland and Port-Cros National Park (3.16) the speed limit is 20kn.
UKHO; H102 Benjamin Heslop 01/19[NP46-No 29-Wk 06/19]
More news
PYA Christmas Ball 2024 Highlights
The PYA Christmas Ball, held on 6 December 2024, was an exceptional evening celebrating the yachting community in style. This year’s theme, Peaky Blinders meets Downton Abbey, provided the perfect blend of elegance and vintage charm, creating a truly memorable atmosphere.
Our annual Christmas Ball is Back Again!
Get ready for an unforgettable evening at the 2024 PYA Christmas Ball, returning to the iconic Martinez in Cannes December 6th! Join us as we celebrate a year of incredible industry achievements, bringing together delegates and leaders from across the yachting world to honour progress, connect, and set our sights on the future.
PYA response to ISS From the Bridge article
"There is no second shift" perfectly summarises the growing challenge in the yachting industry: balancing unlimited guest expectations with limited crew resources. As yachts get smaller, the ability to deliver exceptional experiences while adhering to the Maritime Labour Convention (MLC) becomes increasingly difficult. Even on larger yachts, extended guest occupancy and short turnaround times strain compliance with work and rest regulations.